(51 1) 489 3145   |   (51) 987975959

informes@congresos.encuentrometalurgia.com

SCHEDULE DAY 1: THURSDAY, DECEMBER 1
7:30 a.m. - 8:15 a.m. REGISTRATION, ACCREDITATION Y DELIVERY OF MATERIALS
8:15 a.m. - 8:30 a.m. COMMITTEE’S OPENING REMARKS
SESSION I : MINE TO MILL, CRUSHING 1
8:30 a.m. – 9:00 a.m. IDENTIFYING AND ADDRESSING COMMON OPERATIONAL OPPORTUNITIES IN SAG MILLING CIRCUITS
Prof. Malcolm Powell
UNIVERSITY OF QUEENSLAND
9:00 a.m. – 9:30 a.m. MINE TO MILL METODOLOGY: CASE STUDY AT LAS BAMBAS MINE
Ronald Ticona
ORICA
9:30 a.m. – 10:00 a.m. VIRTUAL: ADVANCED MILL RECOVERY TECHNOLOGY (MILLART) FOR COMPLEX COPPER AND COPPER-GOLD ORES
Barun Gorain
ORE2METAL, Canadá
10:00 a.m. – 10:30 a.m. GYRATORY CRUSHERS TSUV FIFTH GENERATION
FLSMIDTH
10:30 a.m. – 11:10 a.m. COFFEE BREAK
SESSION II : MINE TO MILL, CRUSHING 2
11:10 a.m. – 11:40 a.m. DRILL AND BLAST - FIRST STEP IN OPTIMISING COMMINUTION AND SEPARATION IN MINE TO MILL VALUE CHAIN
Sarma Kanchibotla
ESHAT CONSULTANTS PTY LTD, Australia
11:40 a.m. – 12:10 p.m. ADVANCED MODELING OF CRUSHERS USING THE DISCRETE ELEMENT METHOD
Marcelo Tavares
UFRJ, Brasil
12:10 p.m. – 12:40 p.m. BLASTING PROCESS CONTRIBUTION IN MINERAL GRINDING
Frank Dávila
Consultor & Coach Procesos Mineros, Perú
12:40 p.m. – 13:10 p.m. IMPROVEMENT ALTERNATIVES FOR THE MINERAL FRAGMENTATION TO PLANT TROUGHPUT AT LAS BAMBAS MINE
Erwin Olivera
LAS BAMBAS MINE, Perú
13:10 p.m. – 14:30 p.m. LUNCH
SESSION III : GRINDING MEDIA
14:30 p.m. – 15:00 p.m.
15:00 p.m. – 15:30 p.m. BALL STRING VALIDATION BY AZZARONI METHOD AND ITS COMPARISON THROUGH DISCRETE ELEMENT METHOD (DEM)
Ernesto Vizcardo Cornejo
SIDERPERU, Peru
15:30 p.m. – 16:00 p.m. VIRTUAL: OPERATION STRATEGIES IN MINERAL COMMINUTION AT SEPON MINE
Leonardo Paliza
SEPON
16:00 p.m. – 16:40 p.m. COFFEE BREAK
SESSION IV : HPGR
16:40 p.m. – 17:10 p.m. IMPROVING COMMINUTION ENERGY EFFICIENCY: HIGH-PRESSURE GRINDING ROLLS (HPGR)
Jaime Sepúlveda
J - CONSULTORES LTD, Chile
17:10 p.m. – 17:40 p.m. METSO OUTOTEC HPGR HRCTM
Daniel Suarez
METSO OUTOTEC, Perú
17:40 p.m. – 18:10 p.m. HPGR PRO®: TOWARDS ‘ZERO EMISSIONS’ AND MORE
Mijail Villar, Daniel Wortmann
FLSMIDTH
18:10 p.m. – 19:10 p.m. PLENARY SESSION: MINE TO MILL
Sarma Kanchibotla
19:10 p.m. – 20:10 p.m. OPENING COCKTAIL
SPONSOR BY COPPER 2023 WORLD CONFERENCE + EXPO
SCHEDULE DAY 2: FRIDAY, DECEMBER 2
8:00 a.m. - 8:30 a.m. REGISTRATION, ACCREDITATION Y DELIVERY OF MATERIALS
SESSION V : MODELING AND SIMULATION
8:30 a.m. – 9:00 a.m. MODEL-BASED OPTIMIZATION OF SAG / BALL MILLING CIRCUITS USING LONG-TERM OPERATING RECORDS
Jaime Sepúlveda
J-Consultores Ltd, Chile
9:00 a.m. – 9:30 a.m. SAG MILLING, PAST AND FUTURE
Alex G Doll
ALEX G DOLL CONSULTING LTD., Irlanda
9:30 a.m. – 10:00 a.m. SIMULATIONS AND STRUCTURAL ANALYSIS OF TROMMEL FOR SAG MILL
Rajiv Sharma
TEGA INDUSTRIES
10:00 a.m. – 10:30 a.m. VIRTUAL: STEEL BALLS- A DOUBLE EDGED SWORD IN SAG MILL PERFORMANCE
Aubrey Njema Mainza
UNIVERSITY OF CAPE TOWN, Sudáfrica
10:30 a.m. – 11:10 a.m. COFFEE BREAK
SESSION VI : GRINDING 1, MILL LININGS
11:10 a.m. – 11:40 a.m. TEGA DYNAPRIME: BENEFIT OF HYBRID LININGS IN CONTINUITY OF OPERATION
Patricio Dávila
TEGA INDUSTRIES
11:40 a.m. – 12:10 p.m. PEBBLES IN SAG MILLING: EVOLUTION AND STRATEGIES OF THE PROCESS
Luis Magne - Gilda Ttichoca
LMING
12:10 a.m. – 12:40 p.m. VERTIMILL INSTALLATIONS IN COARSER FEED APPLICATIONS
Daniel Suarez
METSO OUTOTEC, EE. UU.
12:40 a.m. – 13:10 p.m. MODULAR CRUSHING SYSTEMS FOR MINING PROJECTS
Oswaldo Vela
METSO OUTOTEC, EE. UU
13:10 p.m. – 13:40 p.m. APPLICATION OF ADVANCED ANALYTICS IN THE MAINTENANCE OF SAG GRINDING - COATINGS
Ernesto Mori
MINERA LOS PELAMBRES, Chile
13:40 p.m. – 15:00 p.m. LUNCH
SESSION VII : MILLING AND PLANTS OPTIMIZATION I
15:00 p.m. – 15:30 p.m. IsaMillTM DEVELOPMENTS FOR IMPROVED ENVIRONMENTAL SUSTAINABLE COMPLIANCE AND PERFORMANCE
Hans de Waal
GLENCORE TECHNOLOGY, Sudáfrica
15:30 p.m. – 16:00 p.m. INNOVATING THE PREDICTION OF THE COMMINUTION SPECIFIC ENERGY AND DETERMINING ITS RELATIVE ENERGY EFFICIENCY
Roddy Valle
FLSMIDTH
16:00 p.m. – 16:30 p.m. OPTIMIZING COMMINUTION PROCESS TO MAXIMIZE SAG MILL; INTEGRATING MINE AND PLANT PROCESS
Eric Ruiz
LAS BAMBAS MINE, Peru
16:30 p.m. – 17:10 p.m. COFFEE BREAK
SESSION VIII : PLANTS OPTIMIZATION II
17:10 p.m. – 17:40 p.m. PROCESS AUTOMATION FOR COMMINUTION AND CLASSIFICATION – OPPORTUNITIES AND CHALLENGES
Prof. Mohsen Yahyaei
JKMRC, Australia
17:40 p.m. – 18:10 p.m. TECHNICAL PRESENTATION TO BE CONFIRMED
German Ocaña
ANGLOAMERICAN, Peru
18:10 p.m. – 18:40 p.m. TECHNICAL PRESENTATION TO BE CONFIRMED
Edgar Canta
LAS BAMBAS MINE, Peru
18:40 p.m. – 19:40 p.m. PLENARY SESSION: FUTURE TECHNOLOGIES
Malcolm Powell
19:40 p.m. – 20:40 p.m. DELIVERY OF CERTIFICATE / CLOSING COCKTAIL

SEDE - MAPA DE UBICACIÓN

EMPRESAS PARTICIPANTES

© Copyright Comminution 2022 - III International Conference focused on Minerals Size Reduction     |     all rights reserved      |     Powered by : InterMet

© Copyright Comminution 2022 - III International Conference focused on Minerals Size Reduction

all rights reserved

Powered by : InterMet